Loading, Please Wait...
Standard pre-construction subterranean termite treatment happens before the slab is ever poured. Termiticides are applied to the soil to prevent future infestation of any possible subterranean termites to a structure. The cost is fairly minimal, and it means the new building will not have an issue with subterranean termites. Other termite barriers can be installed before the structure is constructed as well. Once the structure reaches the dried-in stage, the wood studs can be treated. Physical termite barriers can also be applied to piping penetrations before the slab is poured, creating a barrier which termites simply can’t penetrate.